Electrical Engineering Projects

Underground Network Project
  • Supply and installation of a pad-mounted transformer, PCB-free, with a capacity of 300KVA, 34.5KV/208V.

  • Transformer replacement service due to failure in a commercial location, on the CNFL service network.

Dos ingenieros con sombreros están parados frente a una caja verde de electricidad
Dos ingenieros con sombreros están parados frente a una caja verde de electricidad
Residential Project Peraz
  • Processing of engineering study and plan approval before CNFL/CFIA (involves civil works aspects).

  • Relocation of electrical networks in front of the interested party (involves civil works aspects).

  • Supply and installation of conventional and self-supporting poles of 13 and 15 meters in height (involves civil works aspects).

  • Supply and installation of public lighting.

  • Medium and low voltage electrical network services for the project.

 Un hombre con casco de seguridad trabajando en un poste.
 Un hombre con casco de seguridad trabajando en un poste.

Peraz Tres Ríos

Residential Project Vía Moravia
  • Processing of engineering study and plan approval before CNFL/CFIA (involves civil works aspects).

  • Relocation of electrical networks in front of the interested party (involves civil works aspects).

  • Supply and installation of conventional poles of 13 meters in height (involves civil works aspects).

  • Supply and installation of public lighting.

  • Medium and low voltage electrical network services for the project.

Moravia

hombre haciendo traslado de redes eléctricas
hombre haciendo traslado de redes eléctricas
Condominium Expansion Development Project
  • Vegetation pruning and cutting services to prevent wildlife access to the distribution line (involves civil works aspects).

  • Change of distribution service from single-phase to three-phase for a 24.9kV network.

  • Replacement of damaged insulators and hardware.

  • Replacement of cracked wooden poles with concrete poles (involves civil works aspects).

Hombres haciendo cambio de postes de madera que presentan fisura a postes de concretos
Hombres haciendo cambio de postes de madera que presentan fisura a postes de concretos

Tamarindo

Condominium El Canal

  • Processing of engineering study with ICE (involves civil works aspects).

  • Relocation of existing poles (involves civil works aspects).

  • Installation of new conventional and self-supporting poles of 13 and 15 meters (involves civil works aspects).

  • Extension of primary overhead network with a voltage of 34.5 KV.

  • Installation of transformers and measurement equipment for the underground network (involves civil works aspects).

hombres cambiando de postes de madera que presentan fisura a postes de concretos
hombres cambiando de postes de madera que presentan fisura a postes de concretos

Grecia

Condominium Residencial Praia
  • Processing of engineering study with ICE (involves civil works aspects).

  • Relocation of existing poles (involves civil works aspects).

  • Installation of new conventional and self-supporting poles of 13 and 15 meters (involves civil works aspects).

  • Extension of primary overhead network with a voltage of 34.5 KV.

  • Installation of transformers and measurement equipment for the underground network (involves civil works aspects).

Instalación de transformadores y equipos de medición para red subterránea
Instalación de transformadores y equipos de medición para red subterránea

Jacó

Transformer Bank 3x167kVA
  • Supply of submersible transformers of 167kVA, 13.8KV-120/208V.

  • Installation and connection of a submersible transformer bank of 167kVA, 13.8KV-120/208V (involves civil works).

  • Extension of the underground primary network (involves civil works).

  • Energy provision and commissioning.

un grupo de hombres haciendo suministro de transformadores tipo sumergible
un grupo de hombres haciendo suministro de transformadores tipo sumergible

Submersible Projects